Build · Construction

New Home Construction in Roatan

Ground-up home construction across Roatan, from beachfront villas to hillside homes. Foundation through final walkthrough, under one contract and one point of contact.

Levy's crew framing an oceanfront addition overlooking the Caribbean
Scope

What's included in a build.

Site preparation

Lot clearing, grading, drainage, and foundation work tied deep into coral bedrock or hillside terrain.

Structural shell

Concrete and block construction engineered for hurricane season and the marine climate.

Roofing & waterproofing

Hurricane-rated roof systems, sealed against driven rain and salt-air corrosion.

Interior fit-out

Drywall, tile, cabinetry, doors, hardware, and finishes coordinated with your design team.

Systems coordination

Plumbing, electrical, HVAC, and low-voltage all routed and inspected before walls close.

Final delivery

Cleanup, punchlist, warranty walkthrough, and handoff with full documentation for permits and resale.

Cost

What it costs to build in Roatan.

Standard island build

Roughly US $120–160 per square foot for concrete-block construction with quality mid-range finishes on an accessible lot.

Upgraded finishes

Roughly US $160–220 per square foot with imported fixtures, custom cabinetry, larger glazing, and covered outdoor living.

Luxury & oceanfront

US $220–300+ per square foot for beachfront or steep-hillside builds with pools, marine-grade materials, and complex foundations.

What moves the number

Site access, hillside versus flat terrain, materials shipped to the island, and finish level move cost more than square footage alone. Every estimate starts with a site visit; ask us for yours.

FAQ

Answers before you break ground.

How much does it cost to build a house in Roatan?

Most custom homes land between US $120 and $220 per square foot depending on finishes and terrain; luxury oceanfront builds run higher. We confirm a range after walking your lot.

How long does a new build take?

Most custom homes run 10 to 14 months from groundbreaking to handoff. Island logistics (shipping windows and permit timing) are built into the schedule from day one.

Who handles permits and licensing?

We coordinate municipal permits and connect you with our partners for architectural design and environmental licensing, so approvals move while the site is being prepared.

Can you build while I'm off-island?

Yes, many of our clients build from abroad. You get one point of contact, scheduled photo and video updates, and a documented walkthrough at every milestone.

How do you build for hurricanes and salt air?

Concrete and block structures, hurricane-rated roof systems, and marine-grade hardware and coatings: the same standards on every home, not an upgrade package.

What's the first step?

Tell us about your lot or plans. Within two business days you'll have a ballpark investment range and a clear next step, no obligation.

Ready to start?

Tell us about your project.

We respond within two business days with clear next steps and a ballpark investment range.